The heart of the facility's installation
Replacement and modernisation of switchgears for businesses and managers
From auditing the existing state to replacing protections, clear circuit descriptions, acceptance measurements, and as-built documentation. You receive a cost estimate of variants before making a decision.
+48 459 566 991phone line open 24 hours, 7 days a week
We plan modernisation during maintenance windows — we announce switchovers and reduce downtime to a minimum.
Symptoms
Signals that the switchgear is asking for an audit.
- Overheating protections and equipment
- Lack of selectivity — one fault shuts down the entire facility
- No space for new circuits
- Illegible or outdated circuit descriptions
- Old devices and worn-out protection devices
- Arcing marks, discolouration, smell during operation
- No documentation of the existing state
The audit ends with numbers on the table
- a report with recommendations and priority,
- a cost estimate of variants — from the minimum to the target,
- an indication of what is urgent and what can be planned.
You make the decision with a complete set of information, not "blindly". Hot spots are confirmed by thermal imaging.
Process
Six stages with the cost known in advance.
- AuditExisting state, documentation, measurement.
- Cost estimate of variantsWritten, before the decision.
- ScheduleService windows and outage plan.
- ReplacementEquipment, circuits and protection devices.
- Acceptance measurementsReport ready for acceptance.
- DocumentationDiagrams and legible circuit descriptions.
What you get
A distribution board you understand.
- A distribution board with selective protection devices
- Legible, up-to-date circuit descriptions
- Space for future circuits, if planned
- Acceptance measurement report
- As-built documentation in the customer panel
- Maintenance recommendations and next dates
FAQ
Questions about distribution boards.
Is it possible to replace a distribution board without stopping the facility?
Usually yes — we divide the work into stages and carry them out during service windows. Some switchovers require a short, pre-announced interruption; we plan it for the time of the least impact.
What does the cost depend on?
On the number and type of circuits, existing state, access, required protection devices and the scope of documentation. That is why we prepare the cost estimate after the audit — in writing, with variants.
Can the audit start with photos?
Photos of the distribution board and a description of the symptoms allow for an initial assessment. The binding scope is established after inspection and measurement of the existing state.
Will I get measurements and documentation?
Yes — acceptance measurements with a report and as-built documentation with diagrams and circuit descriptions. You can also see the scope of larger works in installations and modernisations.
B2B Contact
Book a distribution board audit.
Attach photos of the distribution board and a description of the symptoms — we will get back to you with an assessment and a cost estimate of variants after the inspection.
Our promise: a written cost estimate before the decision, legible circuit descriptions and a complete set of documentation at the end.