Lack of power for a new investment?

Increased power and connections for businesses and premises

A new machine, premises fit-out, or warehouse expansion often require more power. We analyse demand, prepare data for the application, and manage the technical part on the facility's side.

Deadlines on the network operator's (OSD) side are beyond our control – we state this directly and plan our work to be ready on time.

When it's a matter for us

Situations where there is a lack of power.

  • New machine, production line, or device
  • Fit-out of a service or catering premises
  • Expansion of a hall, warehouse, or back-office facilities
  • Lack of free circuits and space in the distribution board
  • Preparation for photovoltaics or EV charging
  • Overheating with increasing load

What is on our side, and what is on the OSD's side

  • demand analysis and solution selection – us,
  • data and technical part on the facility's side – us,
  • connection conditions and deadlines – network operator.

We do not promise deadlines over which we have no control – we plan our work so that the facility is ready when the connection takes place.

Process

From demand to acceptance measurements.

  1. Power analysisLoad balance and forecast.
  2. Data for applicationPreparation of the technical part.
  3. Facility installationDistribution board, circuits, and protections.
  4. Coordination with OSDCooperation on connection conditions.
  5. ImplementationWork according to the agreed schedule.
  6. Acceptance TestsProtocol and documentation.

FAQ

Questions about power and connections.

Can you increase power immediately?

The technical part on the facility side – yes, after analysis. However, increasing the connection capacity requires a procedure with the network operator, whose deadlines are beyond our control. We plan works so that they are not a bottleneck.

Where to start?

With a demand balance: what devices, what power, what operating profile. Based on this, we select a solution and prepare technical data.

Does this include switchboard modernisation?

Often, yes – higher power usually means new circuits and protections. See switchboard modernisation.

Will you prepare the facility for PV or EV charging?

Yes – power analysis is the starting point here. Charging is described separately on the charging stations page.

B2B Contact

Describe your power requirements.

Provide planned devices, power, and facility type – we will prepare a balance, solution selection, and the technical part.

Our principle: a clear division of roles between us and the network operator – no promises about deadlines over which we have no control.

By sending the form, you agree to be contacted regarding your request. Privacy Policy.