Lacking power for a new investment?
Increasing capacity and connections for companies and premises
A new machine, commercial unit fit-out or warehouse expansion often require more power. We analyse the demand, prepare data for the application and manage the technical part on the facility side.
+48 459 566 991phone line open 24 hours, 7 days a week
Deadlines on the network operator's (OSD) side remain beyond our control — we say this upfront and plan our work to be ready on time.
When this is a topic for us
Situations where there is a lack of power.
- New machine, production line or equipment
- Fit-out of a commercial unit or catering premises
- Expansion of a hall, warehouse or back office
- No free circuits and space in the distribution board
- Preparation for photovoltaics or EV charging
- Overheating under increasing load
What is on our side, and what is on the OSD side
- demand analysis and selection of the solution — us,
- data and technical part on the facility side — us,
- connection conditions and deadlines — network operator.
We do not promise deadlines we have no influence over — we plan the work so that the facility is ready when the connection is completed.
Process
From demand to acceptance measurements.
- Power analysisLoad balance and forecast.
- Application dataPreparation of the technical part.
- Facility installationDistribution board, circuits and protections.
- Coordination with OSDCooperation on connection conditions.
- ExecutionWorks within the agreed schedule.
- Acceptance measurementsReport and documentation.
FAQ
Questions about power and connections.
Will you increase the power "on the spot"?
The technical part on the facility side — yes, after analysis. However, increasing the connection capacity requires a procedure with the network operator, whose deadlines remain beyond our control. We plan the work so that it is not a bottleneck.
Where to start?
From the demand balance: what devices, what power, what operating profile. Based on this, we select the solution and prepare the technical data.
Does this include distribution board modernisation?
Often yes — more power usually means new circuits and protections. See distribution board modernisation.
Will you prepare the facility for PV or EV charging?
Yes — power analysis is the starting point here. Charging is described separately on the charging stations page.
B2B Contact
Describe your power requirements.
Specify the planned devices, power, and type of facility — we will prepare the balance, solution selection, and technical part.
Our rule: a clear division of roles between us and the network operator — no promises about deadlines over which we have no influence.