Managers and communities
Dozens of premises, common areas and strict inspection deadlines.
- Measurement campaign schedule with tenant notification
- Summary report + protocol per unit in the panel
- Reminder before the next inspection date
Deadlines under control · protocols without delay
5-year inspection, periodic and acceptance measurements — with a protocol that every manager and insurer will accept. We work out-of-hours and in phases, so that the facility does not lose operational continuity.
Electrical installation inspection is required at least once every 5 years (Prawo budowlane). We keep track of deadlines for you — we remind you before the protocol expires.
Scope of tests
For whom
Dozens of premises, common areas and strict inspection deadlines.
Measurements cannot stop plant operations.
Handover and tenant changes require a complete set of documents on time.
The premises operate during opening hours — we don't have to.
How it works
Proof
We show a sample protocol before commissioning — along with the scope and validity of the qualifications of the people who sign it.
FAQ
Prawo budowlane (Construction Law) requires inspection of electrical and lightning protection systems at least once every 5 years. The insurer, administrator, or nature of the facility may require more frequent inspections — we will check this during valuation and set reminders.
Persons with required qualifications (E and D certificates with measurement authorisations). Their scope and validity dates are shown before commissioning — you have the right to check this with any contractor.
Yes – this is standard practice in facilities that cannot interrupt operations. We arrange service windows, divide tests into stages, or conduct a room-by-room campaign with prior notice.
Typically by the end of the next business day after the tests are completed – as an e-report assigned to the facility in the panel, with a list of circuits and recommendations.
The number of circuits and measurement points, accessibility of distribution boards, after-hours work, and whether current documentation exists. Therefore, we provide a quote based on the facility's data – and we stick to it.
Yes – after modernisations, fit-outs, and for new premises. If we performed the installation, acceptance measurements and as-built documentation are part of the project.
B2B Contact
Provide the type of facility and the approximate number of premises or circuits – we will get back to you with a quote and a proposed schedule.
Our promise: a quote based on facility data, tests without interrupting operations, report typically by the end of the next business day.