Managers and communities
Dozens of premises, common areas and strict inspection deadlines.
- Measurement campaign schedule with tenant notification
- Summary report + protocol per unit in the panel
- Reminder before the next inspection date
Deadlines under control · protocols without delay
5-year inspection, periodic and acceptance measurements — with a protocol that every manager and insurer will accept. We work out-of-hours and in phases, so that the facility does not lose operational continuity.
Electrical installation inspection is required at least once every 5 years (Prawo budowlane). We keep track of deadlines for you — we remind you before the protocol expires.
Scope of tests
For whom
Dozens of premises, common areas and strict inspection deadlines.
Measurements cannot stop plant operations.
Handover and tenant changes require a complete set of documents on time.
The premises operate during opening hours — we don't have to.
How it works
Proof
We show a sample protocol before commissioning — along with the scope and validity of the qualifications of the people who sign it.
What tests, how often, and who is responsible for them — with an annual test planner. Available for download after subscribing to the newsletter.
Register of facility devices, complete protocols in one place, and automatic reminders before each deadline. Inspection asks — you answer in minutes.
FAQ
Prawo budowlane (Construction Law) requires inspection of electrical and lightning protection systems at least once every 5 years. The insurer, administrator, or nature of the facility may require more frequent inspections — we will check this during valuation and set reminders.
Persons with required qualifications (E and D certificates with measurement authorisations). Their scope and validity dates are shown before commissioning — you have the right to check this with any contractor.
Yes – this is standard practice in facilities that cannot interrupt operations. We arrange service windows, divide tests into stages, or conduct a room-by-room campaign with prior notice.
Typically by the end of the next business day after the tests are completed – as an e-report assigned to the facility in the panel, with a list of circuits and recommendations.
The number of circuits and measurement points, accessibility of distribution boards, after-hours work, and whether current documentation exists. Therefore, we provide a quote based on the facility's data – and we stick to it.
Yes – after modernisations, fit-outs, and for new premises. If we performed the installation, acceptance measurements and as-built documentation are part of the project.
B2B Contact
Provide the type of facility and the approximate number of premises or circuits – we will get back to you with a quote and a proposed schedule.
Our promise: a quote based on facility data, tests without interrupting operations, report typically by the end of the next business day.