Power supply of a protective structure — designed for testing, not for declaration

We assess the condition of the installation, priority circuits, emergency lighting, ventilation, communications and backup sources. The result is a technical compliance matrix, scope of modernisation and acceptance scenario.

+48 459 566 99124/7 phone · reports and faults

Qualification or official recognition of the facility is carried out by the competent authority — we provide the electrical layer and technical evidence.

For whommunicipalities · districts · managers of protective structures
Resultcompliance matrix + scope of modernisation + test report
Disclaimerelectrical sector — coordination with others

What we check

Electrical layer of a protective structure — from power supply to documentation.

  • Primary and backup power supply
  • Switchgears and distribution of priority circuits
  • Shock protection, surge protection and selectivity
  • Basic, emergency and escape lighting
  • Power supply for ventilation, pumps, communications and safety systems
  • Generator, UPS or energy storage and the switching method
  • Earthing and lightning protection system
  • Condition of markings, diagrams, instructions and documentation
  • Possibility of safe load testing

Documentation of results

Seven items — from inventory to test report.

  1. Inventoryexisting state of the installation
  2. Compliance matrixrequirement — status — non-compliance — recommendation — priority
  3. Power balanceessential loads
  4. Optionstechnical solutions and phasing
  5. Bill of quantitiesmaterial for cost estimation
  6. Acceptance criteriahow to verify execution
  7. Test reportafter completion of works

Important technical requirements

Regulations for protective structures cover, among others, shock and surge protection, selectivity of protections, separation of circuits, and emergency lighting — indicating at least 3 hours of operation and at least 5 lx in the specified range. A shelter for more than 300 people requires a generator capable of powering the necessary systems. We always relate details to a specific facility and the current regulation.

Dz.U. 2025 poz. 1548 → (external link) · Dz.U. 2025 poz. 933 (OZO) → (external link)

What we do not promise

Official recognition or designation of the facility · safety without structural inspections and other engineering disciplines · a universal solution for every shelter · publication of sensitive diagrams and assets.

Questions and answers

Is it enough to install a generator and emergency lighting?

No. It is necessary to confirm the required acceptances, power balance, switching system, protection, ventilation, fuel, operation, and test scenario — otherwise, the installation exists only on paper.

Will ENERTIA assess the shelter's structure?

The electrical scope does not replace structural, fire, ventilation, or formal assessments. Interdisciplinary coordination is required — we indicate dependencies in the compliance matrix.

Can the documentation be made public?

The public scope should be limited. Detailed power supply diagrams and facility assets are made available exclusively to authorized persons, in a manner agreed with the contracting authority.

Abbreviations used on this page
UPS
uninterruptible power supply
TS
technical specification (description of the subject of the contract)

Unit submission form

Subject: shelters and protective structures · response on business days, urgent matters: 24/7 phone

One submission is enough — the coordinator will get back to you with technical questions or a proposal for the scope and date.