An inspection is approaching, documentation is scattered
We organise the list of facilities, deadlines, scope of measurements, and reports. After the inspection: a list of non-conformities by priority and a repair plan.
Inspections and measurementsWe serve offices, schools, municipal units, cultural facilities, and civil protection entities. We combine inspections, fault rectification, modernisations, and emergency power supply with the documentation required for acceptance and property portfolio management.
+48 459 566 99124/7 phone · reports and faults
Instead of a catalogue of promises — scope, variants, and acceptance criteria that can be verified upon handover of the works.
Not with a catalogue of services. Four most common situations — each has its own card and procedure.
We organise the list of facilities, deadlines, scope of measurements, and reports. After the inspection: a list of non-conformities by priority and a repair plan.
Inspections and measurementsWe establish critical acceptances, response times, escalation paths, and reporting methods. The contract can cover on-call duty and cyclical maintenance.
Maintenance with SLAPower balance, switching system, back-feed protection, earthing, fuel, and trial run. We finish with a test and instructions for the personnel.
Generators and power supplyInventory, variants, bill of quantities, cost estimate, and test scenario. We do not replace the legal service of the procedure.
Documentation for OPZEach product ends with a document that can be verified upon acceptance.
| Product | What it includes | Final document | Details |
|---|---|---|---|
| Portfolio Inspections | Multi-site scheduling, measurements, defect list P1/P2/P3, repair cost estimate | Digital reports + summary report | Service card → |
| Installation passport | Facility equipment register, complete set of reports assigned to the facility, periodic testing calendar | Register + testing calendar | Service card → |
| SLA Maintenance | Confirmation of notification, response times, coordinator and deputy, online status, additional works procedure | Management report (monthly/quarterly) | Inquire → |
| Blackout Ready | Critical handovers, power balance, variant: generator / UPS / battery energy storage system (BESS) / automatic transfer switch (ATS), autonomy plan, power outage test | Audit report + test report | Service card → |
| OLiOC — documentation | Gap analysis, description of needs, variants, bill of quantities, cost estimate, acceptance criteria, scope execution | Technical package for the task | Inquire → |
We prepare the agreed technical part. The correctness of the entire PZP (Polish Public Procurement Law) procedure is assessed by the contracting authority and its legal service.
Defect priorities in the list: P1 — urgent, P2 — to be planned, P3 — for observation.
Formal note: a village council is not an independent civil protection body — our offer for fire stations and community centres is directed to the municipality, and we refer to the facility as a local resilience point, not a new statutory category.
Six steps — like a table of contents of a study. A clear boundary of responsibility at every stage.
We only publish what can be verified. Items in completion are marked with a stamp — instead of zero counters and empty buttons.
The "AFTER VERIFICATION" stamp indicates an item that we will publish after confirmation; "IN PROGRESS" — an item in preparation.
NCAGE is a code identifying an entity in the NATO Codification System — it is not a quality certificate, accreditation, or security clearance.
Download: free guide “Public facility readiness for power outages” (PDF) — readiness audit, emergency power supply, documentation.
We prepare the agreed technical part: inventory, bill of quantities, cost estimate, acceptance criteria and description of requirements. The correctness of the entire PZP (Polish Public Procurement Law) procedure should be assessed by the contracting authority and their legal service.
Yes — we plan this on a portfolio basis: a common data standard, schedule, facility identifiers and a summary report. We confirm the maximum scale and deadline after qualification, not in a slogan.
No. NCAGE is a code identifying an entity in the NATO Codification System. It is not an accreditation, security clearance or confirmation of contract execution. The code can be verified in the official NSPA tool.
Accepting reports works around the clock. Response time, travel time and on-call duty depend on the contract — we do not publish a universal "24/7" without the resources to deliver on it.
One submission is enough — the coordinator will get back to you with technical questions or a proposal for the scope and date.
Information security: do not send classified information, facility layouts, evacuation routes, or security details via the public form. We exchange Terms of Reference (OPZ) documentation through an agreed, secure channel once contact has been established.