Electrical contractor, not a panel salesman
Photovoltaics and energy storage for companies — from connection to self-consumption
We look at PV from the perspective of the facility's installation: connection capacity, protections, integration with the switchboard, energy storage and consumption profile. We base the project design on self-consumption, not on the promise of resale.
+48 459 566 991phone line open 24 hours, 7 days a week
Subsidies and tariffs change — power balance and consumption profile remain. That is why we start the concept with invoice data and profile measurement, not with the number of panels.
Scope
What we do in PV for companies.
- Analysis of consumption profile and contracted capacity from invoices or measurement
- Concept: installation capacity, storage, load priorities
- Formalities with DSO: notification or connection conditions
- Installation with full integration with the switchboard and protections
- Surge protection and fire safety requirements of the PV installation
- Post-installation measurements and documentation for acceptance
- Monitoring the effect: production vs self-consumption after commissioning
PV and reactive energy
- after PV installation, capacitive reactive energy often appears on the invoice,
- this is the result of inverters operating at low active power consumption,
- poorly selected "old" compensation can worsen the problem.
Therefore, we combine the PV project with the analysis of reactive energy — before the fee increases.
Configurator
Select PV, storage and charger — with subsidies.
Consumption from the invoice and the facility's operating profile — in return, a starting point for the concept and financial support that actually applies to you.
Tailored financial support
Respect for the conversation, not just an offer: a realistic selection requires an analysis of the consumption profile, roof or ground area, distribution board and connection capacity. Amounts and conditions of support programmes as of 13.07.2026 — we confirm the current intake before making a decision.
Send the result with your request — we will prepare a concept
Subsidies and applications
Application ready before the intake starts.
We update the amounts and status of programmes with every change in intake — and we prepare the executive documentation to meet the application requirements, not just for commissioning.
| Programme | Target audience | Support | Status |
|---|---|---|---|
| Home Energy Storage (KPO, successor to the Mój Prąd programme) | natural persons with a micro-installation of 2–20 kW | up to 7,000 zł for PV (only with storage) + up to 16,000 zł for energy storage + up to 5,000 zł for heat storage — up to 50% of costs | intake closed on 8.05.2026; we check the status of the next intake on the day of the call |
| Thermomodernisation tax relief | owners of single-family houses | deduction from income up to 53,000 zł per person — covers PV, energy storage and heat storage | permanently available in the PIT tax return |
| Charging infrastructure (NFOŚiGW) | companies, housing associations, local governments | stations ≥22 kW: 25% of costs (private), 30–50% (publicly accessible) | periodic calls for applications |
| PV and storage for business | entrepreneurs | tax-deductible expenses and depreciation; regional programmes change throughout the year | we verify this during the concept stage |
Swipe the table sideways to see the remaining columns.
- Installation parameters compliant with the programme: capacity 2–20 kW, storage min. 2 kWh
- Invoices and reports structured as required by the application
- DSO certificate and annex to the comprehensive agreement after connection
- Data sheets and technical documentation as attachments
- We monitor the application window — the package is ready before it starts
- The application is submitted by the investor in the GWD system — you receive a complete set of attachments and data from us
The grant depends on the intake and the program's budget — which is why we prepare the documents so that the application is ready on day one. Parameters of the KPO program: gov.pl / NFOŚiGW.
Process
From invoice to a working installation.
- Consumption profileInvoices from 12 months or load profile measurement.
- ConceptPV power, storage, self-consumption — options with numbers.
- FormalitiesDSO, grid connection conditions, fire safety approvals.
- InstallationStructure, inverters, integration with the switchboard.
- Measurements and commissioningAs-built measurements, documentation, notifications.
- MonitoringProduction, self-consumption and conclusions after the first quarter.
Numbers, not brochures
What you get in the concept.
- Estimated production compared with your real consumption profile
- Self-consumption: how much energy you will actually use on site
- Option with and without storage — showing the difference in numbers
- Impact on contracted capacity and distribution fees
- Required changes in the switchgear and protection devices
- Schedule of formalities with the DSO
Do you already have a PV offer from another company?
We carry out the electrical part only: connection, protection devices, switchgears, post-construction measurements and acceptance tests — also for installations designed by others.
FAQ
Questions about PV for businesses.
Is commercial PV viable without subsidies?
Usually, self-consumption is the deciding factor: energy consumed on-site replaces energy purchased at the full rate including distribution. If the company's profile matches production (daytime operation), the calculation is often positive without subsidies — and any subsidy only improves it. We calculate this based on your data, not on averages.
What about connection capacity?
The PV installation and energy storage change the facility's balance. We check the contracted capacity and connection conditions, and if an application to the DSO is required, we handle it as part of our connections and capacity service.
Energy storage now or later?
It can be done later — provided the installation is prepared for it: space, cabling, hybrid inverter, or switchgear readiness. This decision should be made at the concept stage, as retrofitting readiness after the fact costs more.
Do you perform only the electrical work for a third-party PV project?
Yes. Connections, protection devices, surge protection, post-installation measurements, and documentation — also when the panels and mounting structure are supplied by another company.
B2B Contact
Let's talk about PV based on your numbers.
Provide your business profile and approximate annual energy consumption (kWh) or attach invoice data in the description — we will get back to you with a concept.
Our rule: a concept calculated on self-consumption from your profile — no brochure promises of savings.