A protective structure operates only as long as its power supply does

Materials for the panel on infrastructure of collective protection facilities at the Wrocław Safety Forum, for gminas, poviats and facility managers. Check whether the lights, ventilation and communications in a shelter, hideout or temporary shelter will work when the grid goes out.

+48 459 566 99124/7 phone · reports and faults

The qualification or official recognition of a facility is carried out by the competent authority. We are responsible for the electrical layer and technical evidence: measurement, power balance, load test and report.

EventWrocław Safety Forum · panel "Infrastructure of collective protection facilities"
Target audiencegminas · poviats · facility managers · housing cooperatives and communities
On this pageassessment card · 10-question self-test · facility notification

Three questions before any purchase

The answer determines the capacity of the power source, its operating time and the scope of work. Without them, the generator is selected according to the building's nameplate, not to what actually needs to work.

After 15 minutes

What must work immediately?

Emergency and directional lighting, communications, alarm systems. These loads cannot wait for a generator to be brought in and connected.

After 3 hours

What must still work?

Three hours is the minimum emergency lighting time required in a protective structure. Ventilation, pumps and communications must work longer, which is the role of the backup power source.

After 3 days

How long will the fuel and personnel last?

The gmina, poviat and voivode provide civil protection resources for at least three days of threat. For the facility, this means fuel, service support, a trained operator with a backup, and an up-to-date manual.

An order that protects the budget

  1. Critical loads list

    Measurement of load and starting currents of pumps and fans.

  2. Power source and switching method

    Capacity selection, generator connection point, backfeed prevention lock.

  3. Test and report

    Load test, instruction manual and trained operator. A test, not a declaration.

Downloadable materials

PDF files available immediately, no sign-up or personal data required. They can be printed and passed on within the authority.

PDF · A4 · 2 pages

MDS electrical quick assessment card

Ten yes/no questions for the facility manager, to be completed on site with a pen. Every "no" is an item for the work plan.

Download card
PDF · A5 · 2 pages

A generator alone is not yet a power supply

Seven questions for the gmina, school and municipal office: before purchasing a generator and after the purchase. To be distributed to the personnel responsible for the equipment.

Download flyer
PDF · A4 · 3 pages

Public facility readiness for power cuts

Guide: legal basis without overinterpretation, self-test in six points, step-by-step audit, and the most common errors with generators.

Download guide

Information security: do not publish or send the completed card via public forms. We exchange facility addresses, diagrams, and weak points exclusively through agreed channels.

Self-test: 10 questions about facility power supply

On-screen version of the card, about two minutes. Answers remain in your browser: we do not save or send anything. Do not provide the name or address of the facility.

A. What must work

Is it clear which consumers must work: lighting, ventilation, communications, pumps, alarm?

Without a list of consumers, it is impossible to select a power source or calculate its operating time.

Are priority circuits separated in the distribution board?

Then the backup source supplies what is essential, not the entire building.

B. Backup source

Is emergency lighting installed and has its operating time been checked?

In a protective structure, emergency escape lighting must operate for at least 3 hours, with an illuminance of at least 5 lx at floor level.

Does the facility have a generator connection point and a mains–0–generator switch or ATS?

A generator without a connection point is just equipment in a warehouse, and connecting it during a crisis is a temporary fix.

Is there a physical interlock against backfeeding into the operator's grid?

Voltage supplied to a disconnected grid poses a hazard to grid operators' linesmen.

Is the generator capacity derived from measuring loads and inrush currents?

Pumps and fans draw multiple times their rated current upon starting.

C. Installation condition

Are periodic measurements of the electrical installation and lightning protection system up to date?

Art. 62 of Prawo budowlane (Polish Building Law): inspection at least once every 5 years, report in the building logbook.

Have earthing, electric shock protection, and surge protection been checked?

In damp rooms and during generator operation, this is fundamental to human safety.

D. People and test

Is there a trained operator and a deputy who know the switching instructions?

Without drills, switching during a crisis will be carried out by someone doing it for the first time.

Has a mains failure test under load taken place and is there a report from it?

Readiness is confirmed by a test, not an entry in a plan.

Answers
0/10
"No" or "don't know"
0

Answer all questions, and we will show the result and the next step.

The result is indicative and applies only to the electrical scope. It does not replace an inspection or an assessment of other engineering disciplines.

From initial consultation to test report

  1. Consultation

    List of facilities, their role in the plan, and available documentation.

  2. Inspection and measurements

    Condition of the installation, critical load handovers, inrush currents, source connection capability.

  3. Report and work plan

    Verdict for the electrical scope: feasible, feasible after modernization, or not recommended under the chosen variant. Plus variants, priorities, bill of quantities, and test scenarios.

What remains after the assessment

  • Matrix: requirement, condition, non-compliance, recommendation, priority
  • Power balance calculation for essential loads
  • Solution variants and phase planning
  • Bill of quantities for cost estimation
  • Acceptance criteria and load test scenario
  • Post-completion test report

Basis

Collective protection facilities include protective structures (i.e. shelters and fallout shelters) and temporary shelter points. For protective structures, regulations require, among others, protection selectivity, dedicated circuits, surge protection, and emergency escape lighting for at least 3 hours; shelters designed for over 300 people must have backup power from a generator set. Facility maintenance includes functional testing of all systems at least once a year. Temporary shelter points have separate requirements. Specific details always apply to a particular facility and current legal regulations.

Dz.U. 2024 poz. 1907 → (external link) · Dz.U. 2025 poz. 1548 → (external link) · Dz.U. 2025 poz. 932 → (external link) · Dz.U. 2025 poz. 933 → (external link)

Assessment boundaries

An electrical assessment is only one of several disciplines. It does not replace structural, ventilation, plumbing, or fire safety assessments. We do not guarantee official designation of a facility, "full compliance", or funding approval.

About this page

This page was prepared by ENERTIA as a supplement to Kacper Połochajło-Migda's participation in the "Infrastructure of collective protection facilities" panel at the Wrocław Security Forum (23 November 2026, Wrocław University of Science and Technology Congress Centre). It is not the official event website.

Questions from the audience

Should the municipality purchase a generator for every building?

No. Regulations do not mandate a "generator in every building". A generator set is required in shelters designed for over 300 people. However, the law obliges the municipality, county, and voivodeship to secure resources for at least three days of emergency, including the operation of collective protection facilities. What to power and where depends on the facility's role. Sometimes a single mobile generator and pre-installed connection points across several facilities is a better solution.

Does a temporary shelter point need to meet shelter requirements?

No. Shelters and fallout shelters are subject to the technical specifications for protective structures. Temporary shelter points are governed by a separate regulation: it requires, among others, installations or connection points for powering loads and lighting of at least 50 lx, but does not require a generator. Whether backup power is necessary depends on the facility's role and the decision of the competent authority.

We already have a generator. Where do we start?

Start by verifying whether it fits the facility: power output relative to measured loads and inrush currents, connection point and mains–0–generator switch or ATS, back-feed protection interlock, and earthing. Then perform a test under agreed load, prepare operating instructions, and train the operator along with a designated deputy.

How much does it cost to prepare the power supply for a shelter point?

It is impossible to provide an accurate estimate without a power balance calculation. The cost depends on the list of loads, required operating time, and the condition of the installation. This is why we start with an assessment, which yields a bill of quantities and data for cost estimation.

Is an electrical assessment sufficient for a facility to be designated as a shelter point?

No. It covers only one engineering discipline, and formal designation is made by the competent authority. The report demonstrates what is feasible, what requires modernization, and what is not recommended under the chosen variant.

Can I send a schematic or site address via the contact form?

No. Do not submit classified information, schematics, evacuation routes, or security details via the public form. Once contact is established, we will set up a secure channel for document exchange.

Abbreviations used on this page
PTS
place of temporary shelter
ATS
Automatic Mains Failure (AMF): automatic switchboard transferring power supply to a backup source
Mains–0–generator
manual changeover switch with a zero position

Submit a facility for discussion

Subject: Security Forum 2026 · response on business days, urgent matters: 24/7 phone support

A single inquiry is enough. We will get back to you with technical questions or a proposed scope and meeting time to discuss the facility.

Information security: do not submit classified information, facility schematics, evacuation routes, or security details via the public form. We exchange documentation via an agreed, secure channel once contact is established.

required field

By submitting the form, you agree to be contacted regarding your request. Privacy policy · Terms and conditions.